HomeNetwork StatusPlanned Maintenance: 21st May 2015

Planned Maintenance: 21st May 2015

Published on

PLANNED Maintenance: 21/05/2015 From 8.00pm – 11pm (BST)

Greetings all.

 

This is a quick notification to let you know that we will be replacing a Firewall on the email blaster network on 21th May 2015 commencing at 8.00pm (BST).

 

Our engineers will be commencing work at 8pm, we expect to have some minor downtime between 8.15pm and 11pm.

 

We will endeavour to minimise the downtime during this maintenance window. The new hardware upgrades will improve performance of the email blaster network, adding extra capacity for peak times.

 

We kindly ask that you avoid scheduling any campaigns during this time period. Any outgoing campaigns will be paused by our engineers.

 

Thank you for your understanding and patience. If you have any queries, please drop me a reply.

 

Kind Regards.

 

Chris Peters

 

Operations Director @ Email Blaster

Latest articles

From Side Hustle to Small Business: Marketing Tips for Success

Many successful small businesses start life as side hustles. What begins as evenings and...

Does Your “Send From” Email Address Make a Difference to Engagement?

Does Your “Send From” Email Address Make a Difference to Engagement? When it comes to...

Email Design Tips for Public Sector

Email Design Tips for the Public Sector Email remains one of the most effective and...

How to Structure Sign-Up Forms to Get More Subscribers

When it comes to growing your email list, the humble sign-up form is one...
- Try Email Blaster for free -spot_img