HomeNetwork StatusPlanned Maintenance: 21st May 2015

Planned Maintenance: 21st May 2015

Published on

PLANNED Maintenance: 21/05/2015 From 8.00pm – 11pm (BST)

Greetings all.

 

This is a quick notification to let you know that we will be replacing a Firewall on the email blaster network on 21th May 2015 commencing at 8.00pm (BST).

 

Our engineers will be commencing work at 8pm, we expect to have some minor downtime between 8.15pm and 11pm.

 

We will endeavour to minimise the downtime during this maintenance window. The new hardware upgrades will improve performance of the email blaster network, adding extra capacity for peak times.

 

We kindly ask that you avoid scheduling any campaigns during this time period. Any outgoing campaigns will be paused by our engineers.

 

Thank you for your understanding and patience. If you have any queries, please drop me a reply.

 

Kind Regards.

 

Chris Peters

 

Operations Director @ Email Blaster

Latest articles

How can I create a sign-up for my website

Inside the Email Blaster software is an app called ‘Subscribe’. It’s a free app...

Do I have to pay when I upload my subscribers?

No, Email Blaster don’t charge you to upload your subscribers. You are welcome to...

How do I set my send from details inside Email Blaster?

Setting your send from details inside your email blaster account is super easy, just...

How can I create a sign-up for my website?

Inside the Email Blaster software is an app called ‘Subscribe’. It’s a free app...
- Try Email Blaster for free -spot_img