Planned upgrades – 30th Dec 2010

On the 30th Dec 2010 between 12.00 and 16.00 we will be installing several new updates to the Email Blaster UK system. During this period,...

Unplanned downtime 10th April

We would like to apologise for unplanned downtime yesterday (10th April 2011). Yesterday a power strip failed on our server rack. This was promptly replaced...

DB Import Wizard Maintenance

We are today running essential maintenance to the database import wizard: Maintenance times: 11am and 11.30am BST on Monday 4th April 2011 During this period the import...

7th Feb 2011 – Evening service updates

Later tonight (between 8.30pm and 9pm), we will be migrating our main database server to more powerful hardware. During this update, there will be no...

Planned Maintenance: 16/03/2013 – 17/03/2013

This weekend we will be running planned maintenance on the email blaster network. Saturday 16/03/2013 maintenance: Migration of all database servers to our new super fast network.  DNS server...